Pittsburgh

Tarentum bridge closure underway; traffic being detoured in both directions – Pittsburgh, Pennsylvania

Pittsburgh, Pennsylvania 2021-06-09 06:03:00 –

Tarentum Bridge is being closed.Traffic diverted in both directions

The eastbound closure will continue until June 13. Closed west until June 27



Learn more about the impact on traffic. >> Good morning. There is a lot of fuss this morning. This closing took place at midnight. So they have already been successful in the last few hours. This is part of a $ 4 million rehab project with 3 points and $ 2–a $ 3.24 million rehab project. That’s why this project is so painful right now. This is because traffic is diverted in the eastbound direction towards New Kensington. These lanes are on Sunday at 1: 159, close to June 13th this Sunday. These Westbound Lanes will not reopen until 11:59 on Sunday, June 27, for an additional two weeks. If you use TARENMTU BRIDGE, expect your trip to take some time. Now I’ll send it back to you in the studio and walk us through those detours. >> The West Bound side exacerbates the hit. The land layer is here. Talentum Bridge Road from the New NKE side, you follow all that road to 7. Cross the new Kenshinon Bridge. ROSS STREET, which boosts AROUNTHD, is closed. It’s not that bad, please RTOEITERATE over and over again. It’s not a week.

Tarentum Bridge is being closed.Traffic diverted in both directions

The eastbound closure will continue until June 13. Closed west until June 27


Work is underway to invest $ 3 million on the Tarentum Bridge to close both sides of the bridge. The closure began early Wednesday morning. It will reopen at midnight, Sunday, June 27. The detour is posted.

Work is underway on a $ 3 million restoration project for the Tarentum Bridge, including closures on both sides of the bridge.

The closure began early Wednesday morning.

The eastbound lane will resume at midnight on Sunday, June 13.

The westbound lane will be closed longer and will reopen late Sunday night, June 27th.

The detour is posted.

Tarentum bridge closure underway; traffic being detoured in both directions Source link Tarentum bridge closure underway; traffic being detoured in both directions

Back to top button